Skip to content
Modular Extensions ScotlandGet a quote
Open the site menu

Modular extension cost in Scotland

A single-storey modular extension typically costs £1,300 to £3,300 per m² installed, including VAT. Move the slider to your floor area and pick a build method for a figure that fits.

24 m²
How it is built

Typical installed price, single storey, including VAT

£50,500 to £79,000

4 m from the back wall6.0 m wide, 4.0 m deep
Drawn to scale as one rectangle off the back wall. The dashed line is 4 m out, the furthest a single-storey extension can reach under Class 1A when it sits within 1 m of a boundary (3 m on a terraced house).

A guide, not a quote. National 2026 figures; island and remote delivery costs more.

Typical prices by size

Floor areaFinished modulesTimber-frame panelsSIPs panels
12 m²Home office or utility room£25,000 to £39,500£17,000 to £29,000£15,500 to £29,000
20 m²Kitchen and dining room£42,000 to £66,000£28,000 to £48,000£26,000 to £48,000
30 m²Open-plan family room£63,000 to £99,000£42,000 to £72,000£39,000 to £72,000
40 m²Living space with a bedroom or shower room£84,000 to £132,000£56,000 to £96,000£52,000 to £96,000

Installed, single storey, including VAT. A guide, not a quote. UK-wide 2026 ranges, rounded to £500. Guides put London and the South East at 20 to 40% above them; no guide prices Scotland on its own.

What the figures cover

The ranges are for a finished, heated, decorated room joined to the house: foundations on ordinary ground, the structure, roof, windows and doors, electrics, plastering and flooring, and a day of crane hire where one is needed. They assume a flat or gently sloping garden and a lorry that can get within reach.

The low end is a plain rectangle with standard glazing. The high end has wide sliding doors, roof lights and better cladding. Glass is the fastest way to move from one end to the other.

The three ways of building

Finished modules (£2,100 to £3,300 per m²) leave the factory as complete sections of room, often with the wiring and plaster done, and are lifted onto the foundations by crane. They are the quickest on site and the most demanding to deliver.

Timber-frame panels (£1,400 to £2,400 per m²) arrive flat and are stood up in a few days, then finished inside like any other build. Timber frame is the ordinary way of building houses in Scotland, so there is no shortage of people who know it.

SIPs panels (£1,300 to £2,400 per m²) sandwich rigid insulation between two boards. They give thin, very well insulated walls, which helps where the permitted depth is tight and every centimetre of floor counts.

Costs particular to Scotland

Three items sit outside the build price and work differently here.

The building warrant fee is fixed nationally by the value of the work, under fee regulations revised from 1 April 2026. Work worth up to £5,000 pays £215. A job valued between £50,001 and £60,000 pays £1,035, and one between £90,001 and £100,000 pays £1,375. Apply late, after work has started, and the fee doubles.

The value is the council's, not your builder's price. Councils use a cost-of-works table to put a figure on the job; Dundee City Council's, from January 2026, counts a single-storey extension at £1,400 per m². That is a fee yardstick, well below what the room will cost you to build. A structural engineer who is an approved certifier of design adds a fee of their own but usually speeds the council's checks.

A planning fee applies only if the extension falls outside permitted development. In a conservation area it always does. The householder fee is set nationally by the Scottish Government; check the current figure when you apply.

There is no Party Wall Act in Scotland and so no party wall surveyor to pay. If the extension touches a mutual wall or shared ground, the cost is a solicitor's time reading the title deeds.

Delivery beyond the central belt

Most of the factories that make extensions are in the central belt or in England. A site in Stirling or Fife adds little. One in Wester Ross, Orkney or the Western Isles adds haulage, ferry fares for vehicles, and nights away for the fitting crew.

Mobile cranes are hired by the day, commonly £400 to £1,500 depending on size; a contract lift for one day, supervisor and slinger included, is about £1,400. A crane that travels half a day each way is paid for the journey. Once a load is wider than 2.9 m it is classed as abnormal and needs notice to the police before it moves, which rules out wide modules on many single-track roads. That is why remote and island jobs are nearly always panels.

Keeping the price down

Keep the shape a rectangle and the width within one lorry load. Put the money into the opening between house and extension, which is the part you will notice every day. Have the kitchen or the decorating priced separately if you want to compare builders fairly. And get the warrant granted before the factory starts, because changes made after manufacture are the most expensive kind.

Sources

Build prices are typical national ranges for 2026 drawn from published UK cost guides; they are not offers. Fees and rules come from the official sources below.

Cost questions

How much is a modular extension per square metre in Scotland?

For a single storey, fitted and with VAT, typically £1,300 to £3,300 per m². Finished modules sit at the top of that band and panel systems lower down; the spec decides the rest. These are UK figures, as no market prices are published for Scotland alone.

Will factory-built work cost less than brick and block?

Rarely by much, and sometimes not at all. The saving is mostly time on site and fewer weather delays. Compare like with like: the same size, the same glazing and the same finish.

Is VAT charged on a house extension?

It is, at the standard 20%, because extending an existing home does not qualify for relief. The figures on this site include it. Most quotes to homeowners do too, but ask, because a trade-style quote may not.

Does it cost more in the Highlands and islands?

Generally yes. The room costs the same to make, but haulage, ferries, crane travel and accommodation for the fitting crew are added. Ask for those as separate lines in the quote.

What is not included in these figures?

Design and engineering fees, the building warrant and any planning fee, a fitted kitchen, and work to the existing house beyond the opening. Ground that needs piling also costs extra.

Price a room this size

Three short screens: the postcode, four questions about the room, and how to contact you. There is no charge and no obligation to go ahead.

We don't build extensions ourselves. We match your enquiry with one firm that works in your area, name it to you, and send your details over only once you agree.

Screen 1 of 3

Which postcode is the house in?
Get a quote